Longking Australia is introducing a new generation of battery-electric mining trucks to the Australian market. Designed for heavy-duty mine operations, the range combines high payload capacity, electric-drive performance, regenerative energy management and integrated charging or battery-swapping infrastructure.

The Longking Fleet…

ZL150E – Available to ship 3 months after order taken

  • 150-tonne maximum load capacity
  • 1,600 kWh battery
  • 6×4 drive configuration
  • More than 25% gradeability
  • Maximum speed of 45 km/h
  • 75 m³ struck and 86 m³ heaped body capacity

ZL230E – Available to ship 3.5 months after order taken

  • 230-tonne maximum load capacity
  • 1,418 kWh battery
  • 6×4 drive configuration
  • 38% gradeability
  • Maximum speed of 50 km/h
  • 20–80% charge time of ~25 minutes

ZL360E – ETA end of 2026

  • 360-tonne maximum load capacity
  • 4,536 kWh battery
  • 6×4 drive configuration
  • 25+% gradeability
  • Maximum speed of 50 km/h
  • 20–80% charge time of ~28 minutes
  • Multi-axle distributed independent drive
  • Independent rear-axle drive
  • No interruption during gear changes
  • Intelligent energy distribution
  • Regenerative energy recovery

Rigid frame designed for torsional resistance and load distribution

  • ROPS and FOPS cab protection
  • Multiple braking assemblies
  • Emergency steering systems
  • Steering accumulators
  • Redundant steering and braking functionality

Mine Electrification as an Integrated System

How it works

1

Mine Analysis

Review haul routes, gradients, loads, cycle times, climate, energy availability and fleet requirements.

2

Technical and Economic Model

Compare electric and incumbent fleets across energy cost, productivity, maintenance, infrastructure and lifecycle economics.

3

Charging or Battery Swap

Energy infrastructure designed around your mine.

4

Pilot Deployment

Introduce a controlled initial fleet with agreed performance measures.


5

Fleet Transition

Move to staged or full-scale deployment supported by energy infrastructure, training and service capability.


Powering Your Fleet

Charging and battery-swap systems can be configured around fleet size, duty cycle, available grid capacity, renewable generation and the operational requirements of each mine.

Charging

  • Claimed 20–80% charge time of 25 minutes
  • Compatibility with up to 18 simultaneous chargers

Battery Swap

  • Battery swapping in up to four minutes
  • More than 160 swap cycles per day
  • Up to 20 battery compartments

Servicing Your Fleet

Longking Australia is developing a local service, spare-parts and technical-support model for Australian deployments. Each pilot and fleet proposal will include a defined support plan covering commissioning, training, preventative maintenance, parts availability, technical response and warranty administration.

A Commercial Pathway to Fleet Electrification

Longking Australia combines equipment capability with Australian commercial and finance expertise. We work with mining clients and finance partners to evaluate purchase, leasing, project-finance and staged deployment structures.

  • Direct purchase
  • Equipment finance
  • Operating lease
  • Pilot-to-fleet structure
  • Energy-as-a-service
  • Charging-infrastructure finance
  • Battery ownership alternatives
  • Project funding
  • Total-cost-of-ownership modelling

Begin Your Mine Electrification Today…