
Introducing The Zijin Longking ZL70EI…



- Rated Payload: 70000 kg
- Battery Capacity: 528 kWh
- Drive Configuration: 6×4
- Maximum Gradeability: 25%
- Turning Radius: 9.6m
- Maximum Speed: 30km/h
- Suspension System: Full Hydro-Pneumatic Suspension
- Steering System: Full Hydraulic Steering
- Tire Size: 27.00R49
- Body Volume (m3): 75
Mine Electrification as an Integrated System
How it works
1
Mine Analysis
Review haul routes, gradients, loads, cycle times, climate, energy availability and fleet requirements.
2
Technical and Economic Model
Compare electric and incumbent fleets across energy cost, productivity, maintenance, infrastructure and lifecycle economics.
3
Charging or Battery Swap
Energy infrastructure designed around your mine.
4
Pilot Deployment
Introduce a controlled initial fleet with agreed performance measures.
5
Fleet Transition
Move to staged or full-scale deployment supported by energy infrastructure, training and service capability.
Powering Your Fleet
Charging and battery-swap systems can be configured around fleet size, duty cycle, available grid capacity, renewable generation and the operational requirements of each mine.
Charging
- Claimed 20–80% charge time of 25 minutes
- Compatibility with up to 18 simultaneous chargers
Battery Swap
- Battery swapping in up to four minutes
- More than 160 swap cycles per day
- Up to 20 battery compartments

Servicing Your Fleet
Longking Australia is developing a local service, spare-parts and technical-support model for Australian deployments. Each pilot and fleet proposal will include a defined support plan covering commissioning, training, preventative maintenance, parts availability, technical response and warranty administration.
A Commercial Pathway to Fleet Electrification
Longking Australia combines equipment capability with Australian commercial and finance expertise. We work with mining clients and finance partners to evaluate purchase, leasing, project-finance and staged deployment structures.
- Direct purchase
- Equipment finance
- Operating lease
- Pilot-to-fleet structure
- Energy-as-a-service
- Charging-infrastructure finance
- Battery ownership alternatives
- Project funding
- Total-cost-of-ownership modelling
