This project is located in 3Q Lithium Salt Lake, Catamarca Province, Argentina, and is used for the production and living electricity of the lithium extraction project in the salt lake. Among them, the capacity of the energy storage system on the mountain is 6.4MW/38.4MWh, which is not supported by the power grid, and adopts the grid-configuration type of energy storage to provide energy for the necessary production equipment and the living area of the employees when there is no photovoltaic power generation in the evening; and the capacity of the storage system under the mountain is 12MW/24MWh, which is mainly used for cooperating with the photovoltaic power generation system and the power grid peaking, to reduce the abandonment rate of light, to realize the integration of light and storage, and to reduce the cost of energy consumption effectively. The project will be launched in the next few months. The commissioning of the two projects in this mine provides stable green energy for production and life, and realizes the plan of clean energy use in the mineral area.
Argentina Grid-forming Energy Storage Project,18.4MW/62.4MWh Project, Catamarca Province, Argentina
1–2 minutes
to read
Keep Reading
-
The project is situated in the mining area of Julong Copper Mine in Maizhokunggar County, Xizang Autonomous Region, serving as a large-scale application project for high-altitude, large-tonnage pure electric rigid mining trucks.The mining truck is…
-
The project is located in Zijinshan Copper-Gold Mine, Shanghang County, Fujian Province. The vehicle is deeply integrated with the mine’s production system, enabling core functions such as heavy-duty transportation, continuous operation under all working conditions,…
