This project is located in the gold mining area of Bor State, Serbia, Europe. The battery system adopts the company’s self- developed and produced liquid-cooled 1P48SPACK combination, the cabin is a standard 20-foot outdoor cabinet, which is convenient for transport and delivery, and the equipment is integrated with the BMS, fire protection system, temperature control system, etc., and the capacity of a single battery cabin is 3.44MWh, with the project configured with a total of 58 sets of liquid-cooled battery cabins, and the converter booster adopts 3450kW centralised integrated machine. The project is equipped with a total of 58 sets of liquid-cooled battery chambers, and the converter-booster Integrated machine adopts a 3450kW centralised integrated machine. The completion of this project will provide strong support for the mining enterprise to build the first modern “park-style” green mine in Serbia.
Serbia Mine PV+ESS 100MW/200MWh Grid-forming Project
1–2 minutes
to read
Keep Reading
-
The project is situated in the mining area of Julong Copper Mine in Maizhokunggar County, Xizang Autonomous Region, serving as a large-scale application project for high-altitude, large-tonnage pure electric rigid mining trucks.The mining truck is…
-
The project is located in Zijinshan Copper-Gold Mine, Shanghang County, Fujian Province. The vehicle is deeply integrated with the mine’s production system, enabling core functions such as heavy-duty transportation, continuous operation under all working conditions,…
