Complete Electric Mine INFRASTRUCTURE
Large Electric Haul Trucks
For high-volume open-pit mining and heavy-load transport
Autonomous Electric Haul Trucks
Cabless and autonomous-ready configurations for controlled mine environments.
Charging and Battery-Swap Systems
Mine-specific energy infrastructure designed around fleet size, haul cycles and operating requirements.
Power Station Optimisation and Decarbonisation
A staged pathway to lower emissions, improved efficiency and long-term transition.
Complete Mine Electrification
Renewable integration and commercial structuring, we provide a practical pathway from pilot deployment to fleet-scale electrification
Introducing BESS, our complete power infrastructure…
How We Work
Supported by Longking’s global engineering, manufacturing, energy-storage and environmental technology platform
1
Mine Analysis
Review haul routes, gradients, loads, cycle times, climate, energy availability and fleet requirements.
2
Technical and Economic Model
Compare electric and incumbent fleets across energy cost, productivity, maintenance, infrastructure and lifecycle economics.
3
Pilot Deployment
Introduce a controlled initial fleet with agreed performance measures.
4
Validation
Assess availability, payload, charging, energy consumption, operator experience and maintenance.
5
Fleet Transition
Move to staged or full-scale deployment supported by energy infrastructure, training and service capability.
PERFORMANCE BY THE NUMBERS
55 Years of Longking Global Engineering History
7,000+ Global Employees
50+ Countries integrating Longking Solution’s
Ready to Electrify?
Turn on your mine’s full potential!
Electrifying a mining fleet requires more than replacing a diesel powertrain. Longking Australia considers the truck, battery, charging infrastructure, energy supply, haul profile, operating schedule and commercial structure as one integrated mine-energy system.
Tran Siu
Executive Director of Longking Australia
Common Questions
220-tonne maximum load capacity.
1,418 kWh battery
6×4 drive configuration
38% gradeability
Maximum speed of 50 km/h
Claimed 20–80% charge time of 25 minutes
In 4 minutes. Our largest truck can have the batteries replaced and back running in 4 minutes…